Optimal PV location choice considering static and dynamic constraints M Mosbah, A Khattara, M Becherif, S Arif International Journal of Emerging Electric Power Systems 18 (1), 20160141, 2017 | 25 | 2017 |
Line-fault ride-through (LFRT) capabilities of DFIG wind turbine connected to the power system A Khattara, M Bahri, A Aboubou, M Becherif, MY Ayad APCBEE procedia 7, 189-194, 2013 | 10 | 2013 |
Optimal placement of distributed generation based pv source in electrical power system for LVSI improvement using GA algorithm SH Oudjana, R Zine, M Mosbah, A Khattara, S Arif Artificial Intelligence and Renewables Towards an Energy Transition 4, 252-259, 2021 | 9 | 2021 |
Influence of wind penetration in the optimization of the economic dispatch A Khattara, A Aboubou, M Bahri, MY Ayad, M Becherif, M Wack 2012 First International Conference on Renewable Energies and Vehicular …, 2012 | 7 | 2012 |
Optimal number of DFIG wind turbines in farm using Pareto genetic algorithm to minimize cost and turbines fault effect A Khattara, M Becherif, MY Ayad, M Bahri, A Aboubou IECON 2013-39th Annual Conference of the IEEE Industrial Electronics Society …, 2013 | 6 | 2013 |
The choice of DFIG wind turbine location according to its line fault ride through (LFRT) capability A Khattara, M Becherif, MY Ayad, A Aboubou Unité de Recherche Appliquée en Energies Renouvelables, Ghardaïa–Algérie 13, 2014 | 5 | 2014 |
Optimal wind turbine site for voltage stability improvement using genetic algorithm technique A Khattara, M Mosbah, R Zine, M Ould-Sidi, S Hamid-Oudjana, Y Soufi Artificial Intelligence and Heuristics for Smart Energy Efficiency in Smart …, 2022 | 3 | 2022 |
Influence of wind turbine location in the optimization of the economic dispatch using genetic algorithm method A Khattara, A Aboubou, M Bahri, M Becherif, MY Ayad, O Akhrif 4th International Conference on Power Engineering, Energy and Electrical …, 2013 | 3 | 2013 |
Line-fault ride-through (LFRT) capabilities of wind DFIG turbine A Khattara, A Aboubou, M Bahri, M Becherif, MY Ayad, O Akhrif 4th International Conference on Power Engineering, Energy and Electrical …, 2013 | 3 | 2013 |
Optimal location and size of shunt capacitor in distribution using metaheuristic method M Mosbah, A Khattara, R Zine, M Ould-Sidi, S Hamid-Oudjana, Y Soufi Artificial Intelligence and Heuristics for Smart Energy Efficiency in Smart …, 2022 | 2 | 2022 |
Optimal Placement of Distributed Generation Based PV Source in Electrical Power System for LVSI Improvement Using GA Algorithm A Khattara, S Arif Artif. Intell. Renew. Towards Energy Transit 174, 252, 2021 | 2 | 2021 |
Linefault ride-through (lfrt) capabilities of wind dfig turbine connect to the power system A Khattara, A Aboubou, M Bahri, A Henni, MY Ayad 2nd International Conference on Clean and Green Energy (ICCGE 2013), 2013 | 2 | 2013 |
A novel equilibrium optimization algorithm for optimal coordination of directional overcurrent relays MR Djamel, M Mustafa, Z Rabie, K Abdelouahab, MO Sidi, Y Soufi 2023 International Conference on Electrical Engineering and Advanced …, 2023 | 1 | 2023 |
New connection of DFIG wind turbines to the grid to minimize converter number A Khattara, M Becherif, A Tabanjat, A Aboubou International Journal of Emerging Electric Power Systems 18 (3), 20160140, 2017 | 1 | 2017 |
Choice of Wind Turbine Location According to Its Influence on the Optimization of the Economic Dispatch Poblem Using Genetic Algorithm Method A Khattara, M Becherif, M Bahri, A Aboubou Journal of Electrical Engineering (JEE) 14 (3), 302-309, 2014 | 1 | 2014 |
Modélisation, Commande et Gestion de l’Energie d’un Générateur Eolien A Khattara Université Mohamed Khider Biskra, 2014 | 1 | 2014 |
Improved-GWO for Shunt Capacitors Placements and Dimensions in Distribution Networks M Mustafa, K Abdelouahab, Z Rabie, MR Djamel, OS Maawiya, S Yousef 2023 International Conference on Electrical Engineering and Advanced …, 2023 | | 2023 |
CHOICE OF WIND TURBINE LOCATION ACCORDING TO ITS INFLUENCE ON THE OPTIMIZATION OF THE ECONOMIC DISPATCH PROBLEM USING GENETIC ALGORITHM METHOD A Khattara, M Becherif, M Bahri, A Aboubou Journal of Electrical Engineering 14 (3), 7-7, 2014 | | 2014 |
Impact of photovoltaic integration in the distribution network on time delay of element protections A Khattara, M Mosbah, M Becherif | | |