Follow
Reinhard Bürgy
Title
Cited by
Cited by
Year
Employee scheduling with short demand perturbations and extensible shifts
R Bürgy, H Michon-Lacaze, G Desaulniers
Omega 89, 177-192, 2019
452019
The flexible blocking job shop with transfer and set-up times
H Gröflin, DN Pham, R Bürgy
Journal of Combinatorial Optimization 22 (2), 121-144, 2011
442011
The job shop scheduling problem with convex costs
R Bürgy, K Bülbül
European Journal of Operational Research 268 (1), 82-100, 2018
272018
The blocking job shop with rail-bound transportation
R Bürgy, H Gröflin
Journal of Combinatorial Optimization 31, 152-181, 2016
252016
Optimal job insertion in the no-wait job shop
R Bürgy, H Gröflin
Journal of Combinatorial Optimization 26 (2), 345-371, 2013
232013
A neighborhood for complex job shop scheduling problems with regular objectives
R Bürgy
Journal of Scheduling 20 (4), 391-422, 2017
202017
The no-wait job shop with regular objective: a method based on optimal job insertion
R Bürgy, H Gröflin
Journal of Combinatorial Optimization 33, 977-1010, 2017
102017
A decomposition-based heuristic for large employee scheduling problems with inter-department transfers
D Attia, R Bürgy, G Desaulniers, F Soumis
EURO Journal on Computational Optimization 7 (4), 325-357, 2019
72019
A capacitated multi-vehicle covering tour problem on a road network and its application to waste collection
V Fischer, MP Paneque, A Legrain, R Bürgy
European Journal of Operational Research 315 (1), 338-353, 2024
62024
An exact dynamic programming algorithm for the precedence-constrained class sequencing problem
R Bürgy, A Hertz, P Baptiste
Computers & Operations Research 124, 105063, 2020
62020
Complex Job Shop Scheduling: A General Model and Method
R Bürgy
PhD thesis, University of Fribourg, 2014
52014
Mixed-Integer Programming Heuristics for the Blocking Job Shop Scheduling Problem
J Lange, R Bürgy
Proceedings of the 14th Workshop on Models and Algorithms for Planning and …, 2019
12019
Online heuristics for unloading boxes off a gravity conveyor
P Baptiste, R Bürgy, A Hertz, D Rebaine
International Journal of Production Research 55 (11), 3046-3057, 2017
12017
On Job Shop Problems with Blocking and Flexible Machines
R Bürgy
Master's Thesis, University of Fribourg, 2009
12009
A Facility Location Problem with Minimum Workload and Penalties for Waste Collection
M Pacheco Paneque, V Fischer, R Bürgy
International Conference on Operations Research, 81-86, 2021
2021
Networks of Critical Infrastructures: Cost Estimation and Defense of Attacks
R Bürgy
The Security of Critical Infrastructures: Risk, Resilience and Defense, 17-31, 2020
2020
A stochastic online algorithm for unloading boxes from a conveyor line
R Bürgy, P Baptiste, A Hertz, D Rebaine, A Linhares
Flexible Services and Manufacturing Journal 30 (4), 764–784, 2018
2018
The system can't perform the operation now. Try again later.
Articles 1–17