Employee scheduling with short demand perturbations and extensible shifts R Bürgy, H Michon-Lacaze, G Desaulniers Omega 89, 177-192, 2019 | 45 | 2019 |
The flexible blocking job shop with transfer and set-up times H Gröflin, DN Pham, R Bürgy Journal of Combinatorial Optimization 22 (2), 121-144, 2011 | 44 | 2011 |
The job shop scheduling problem with convex costs R Bürgy, K Bülbül European Journal of Operational Research 268 (1), 82-100, 2018 | 27 | 2018 |
The blocking job shop with rail-bound transportation R Bürgy, H Gröflin Journal of Combinatorial Optimization 31, 152-181, 2016 | 25 | 2016 |
Optimal job insertion in the no-wait job shop R Bürgy, H Gröflin Journal of Combinatorial Optimization 26 (2), 345-371, 2013 | 23 | 2013 |
A neighborhood for complex job shop scheduling problems with regular objectives R Bürgy Journal of Scheduling 20 (4), 391-422, 2017 | 20 | 2017 |
The no-wait job shop with regular objective: a method based on optimal job insertion R Bürgy, H Gröflin Journal of Combinatorial Optimization 33, 977-1010, 2017 | 10 | 2017 |
A decomposition-based heuristic for large employee scheduling problems with inter-department transfers D Attia, R Bürgy, G Desaulniers, F Soumis EURO Journal on Computational Optimization 7 (4), 325-357, 2019 | 7 | 2019 |
A capacitated multi-vehicle covering tour problem on a road network and its application to waste collection V Fischer, MP Paneque, A Legrain, R Bürgy European Journal of Operational Research 315 (1), 338-353, 2024 | 6 | 2024 |
An exact dynamic programming algorithm for the precedence-constrained class sequencing problem R Bürgy, A Hertz, P Baptiste Computers & Operations Research 124, 105063, 2020 | 6 | 2020 |
Complex Job Shop Scheduling: A General Model and Method R Bürgy PhD thesis, University of Fribourg, 2014 | 5 | 2014 |
Mixed-Integer Programming Heuristics for the Blocking Job Shop Scheduling Problem J Lange, R Bürgy Proceedings of the 14th Workshop on Models and Algorithms for Planning and …, 2019 | 1 | 2019 |
Online heuristics for unloading boxes off a gravity conveyor P Baptiste, R Bürgy, A Hertz, D Rebaine International Journal of Production Research 55 (11), 3046-3057, 2017 | 1 | 2017 |
On Job Shop Problems with Blocking and Flexible Machines R Bürgy Master's Thesis, University of Fribourg, 2009 | 1 | 2009 |
A Facility Location Problem with Minimum Workload and Penalties for Waste Collection M Pacheco Paneque, V Fischer, R Bürgy International Conference on Operations Research, 81-86, 2021 | | 2021 |
Networks of Critical Infrastructures: Cost Estimation and Defense of Attacks R Bürgy The Security of Critical Infrastructures: Risk, Resilience and Defense, 17-31, 2020 | | 2020 |
A stochastic online algorithm for unloading boxes from a conveyor line R Bürgy, P Baptiste, A Hertz, D Rebaine, A Linhares Flexible Services and Manufacturing Journal 30 (4), 764–784, 2018 | | 2018 |